Home › Dry screed › NORIT-TE 25
NORIT-TE gypsum fibre screed board
Edge profiles of two NORIT-TE boards with a groove for the adhesiveClose-up of the click joint between two NORIT-TE boardsCorridor in a renovated office building with a NORIT dry floor
NORITDry screed · Lindner

NORIT-TE 25 gypsum fibre dry floor

A 25 mm gypsum fibre screed board, made by Lindner in Germany. You glue the boards in the groove and click them together, without screws or staples. Together they form a load-distributing layer under all common floor finishes.

  • 1200 × 600 × 25 mm
  • 0.72 m² per board
  • Fire class A1
  • Wet rooms up to W1-I

Not in the JUPITER Shop. Ask us about the options for your project.

What is NORIT-TE 25 suitable for?

  • As a load-distributing screed under all common floor finishes.
  • The thickest board in the NORIT screed range: 25 mm.
  • Wet rooms up to water exposure class W1-I according to DIN 18534, such as a bathroom floor in a home, with suitable waterproofing.
  • With underfloor heating: as a screed on a NORIT-TE Therm GF element or on a dry-build underfloor heating system such as JUPITER IDEAL.
Not suitable for

Floors with a floor drain or channel, such as a walk-in shower (class W2-I and higher). For heavy or concentrated loads: ask for advice first.

Technical data

Format1200 × 600 mm
Thickness25 mm
Coverage per board0.72 m²
Weightapprox. 23.4 kg per board (approx. 32.5 kg/m²)
Densityapprox. 1,250 kg/m³
MaterialGypsum fibre: gypsum with cellulose fibres
JointClick joint, glued with NORIT-TE adhesive (solvent-free PU adhesive, open time approx. 30 min at 20 °C)
Fire classA1, non-combustible (EN 13501-1)
Product standardEN 14190
Wet roomsWater exposure class W0-I and W1-I
Packaging50 boards per pallet (approx. 1,185 kg, 36 m²)

Source: Lindner product data sheet NORIT-TE 20/25 (DB_N_TE_20_25/EN/5.0). Sound insulation and fire resistance depend on the complete floor build-up and are therefore not listed in this table; ask for advice on your build-up.

Material and environment

90–96 % gypsum
and 4–10 % cellulose fibres; both recycled from production processes (pre-consumer)
5.05 kg CO₂-eq/m²
production stage (A1–A3), average NORIT screed board according to the IBU EPD, valid until 27 October 2030

Installation

Tools: hand-held circular saw with guide rail, jigsaw for curves and cut-outs, NORIT-TE adhesive, tapping block, hammer and pull bar.

  1. 1Let the boards acclimatise on site for 2 days and fit edge insulation along all walls: PE foam, stone wool or an alternative, depending on the requirements.
  2. 2Apply NORIT-TE adhesive in the groove. At 20 °C the adhesive remains workable for about 30 minutes.
  3. 3Click in the next board and close the long joints. Tap the short ends together with the tapping block and hammer.
  4. 4Fit the edge boards with the pull bar.
  5. 5Apply the floor finish according to the installation guidelines and in line with the wishes and requirements of the floor finish supplier.
How many boards do you need?

Including approx. 10 % cutting waste: area × 1.1 ÷ 0.72.

Area in m²
62boards NORIT-TE 25

Approx. 2 pallets (50 boards per pallet)

  • Edge insulationapprox. 40 m
  • NORIT-TE adhesive, 1 kg bottleapprox. 1 bottle

Averages: approx. 1 m of edge insulation per m² and 1 bottle of adhesive per approx. 40 m². The actual quantity depends on the shape of the room.

Request a quote

What do you save without screws or staples?

You glue NORIT-TE boards and click or push them together. A common screwed gypsum fibre screed system adds approx. 15 screws or approx. 19 staples per m². Work out for yourself what that saves in your project.

Less work, only gypsum fibre in the floor

No screws or staples. You do not need to buy, count or drive them.

Less finishing work. According to Lindner, there is less filling and rework before the floor finish goes on.

No metal in the floor. If the floor is sawn or milled later, the tools do not hit any screws or staples. The floor contains only gypsum fibre boards and cured adhesive: PU adhesive (NORIT-TE adhesive) or PVAc adhesive.

Check it with your own figures

Enter your own time per screw or staple and your hourly rate. We do not fill these in for you.

Area in m²
Time per screw or staple, in seconds
Extra finishing work per m², in minutes (optional)
Hourly rate in euros
600fewer screws

or approx. 760 staples

  • Labour time–
  • Labour costs–

Enter your time per screw or staple and your hourly rate.

Indication based on your own input. Quantities according to the installation guidelines of a common screwed gypsum fibre screed system: approx. 15 screws (spacing max. 20 cm) or approx. 19 staples (max. 15 cm) per m². Material costs for screws and staples are not included.

Downloads

Not sure about the build-up?

About the subfloor, wet rooms or underfloor heating: JUPITER Benelux is happy to advise. Weekdays 08:00–17:00 (CET).